Power Plant Construction
2x600MW units, steel structure for the plant body, furnace body, and related auxiliary systems. Peak height: 207m.
Power Plant Construction
2x600MW units, hoisting of the new blast furnace body. Peak height: 167m.
Power Plant Construction
600MW unit, installation of new blast furnace body and piping. Peak height: 185m.
Power Plant Construction
3x300MW units, installation of new blast furnace body, auxiliary structures, and piping.
Power Plant Construction
Installation of new blast furnace body, piping, and overall hoisting of steel structure.
Power Plant Construction
Hoisting of 3x300MW units along with piping and steel structures.
Power Plant Maintenance
Overhaul of 600MW units.
Steel Plant Construction
Installation of blast furnace body, workshop, auxiliary piping, and fabrication of non-standard equipment.
Steel Plant Maintenance
Blast furnace overhaul including demolition and installation of the body.
Steel Plant Construction
Fabrication and installation of hot blast stoves.
Steel Plant Construction
Installation of blast furnace body and replacement of related auxiliary facilities.
Steel Plant Construction
Fabrication and installation of steel structure workshop and blast furnace body equipment.
Steel Plant Construction
Installation of workshop, piping, and equipment.
Steel Structure Engineering
Fabrication and installation of all auxiliary steel structures for Sanhuajian.
Pipeline Engineering
Production and installation of all steel structure groups.
Pipeline Engineering
Installation of a 16km heating pipeline.
Steel Plant Construction
Workshop and equipment installation by MCC19.
Steel Plant Construction
Blast furnace body installation and Phase II workshop design, fabrication, and installation.